The capacity case rather than the reliability one: more load on the same cable, no new runs.

01

18% additional usable capacity against the static ratings

02

New loads added without laying new cable runs

03

Real-time capacity now a standard input when the site evaluates new load requests

About BASF

BASF's industrial site runs continuous, energy-intensive production, where an unplanned MV outage stops production lines directly.

The challenge

As the site's power demand grew, its internal grid team faced a familiar choice: fund new cable infrastructure to serve additional load, or find a way to safely use more of the capacity already in the ground.

Our contribution

Real-time thermal rating went on the highest-utilisation MV feeders, replacing static worst-case ratings with dynamic ratings based on actual cable and ambient conditions, combined with integrated risk monitoring so additional load was only ever carried within limits validated by live data rather than by assumption.

The benefits

Real-time rating revealed 18% additional usable capacity against the static ratings — capacity BASF used to add new loads without laying new cable runs.

The site now treats real-time capacity as a standard input when evaluating new load requests, rather than defaulting to a new-infrastructure project as the first option.