Distribution Operators

The queue for a connection forms on the distribution network, and so does most of the interruption time reported to regulators. Both are decided by cable nobody has been able to see.

What this network is up against

Connection requests arrive faster than reinforcement can be built, and the answer has to be defensible either way.

Interruption duration is a regulated number, and most of it is spent finding the fault rather than repairing it.

Replacement programmes are set by installation year because asset condition has not been visible through continuous monitoring.

What applies here

Grid Reliability

Stop managing faults. Start preventing them.

How it works

Grid Renewal

Replace cables based on condition, not age.

How it works

Grid Optimization

Unlock capacity already in your network.

How it works

Operators in this sector

Marks shown are customers of the platform. Which sector each belongs to is our classification.

AllianderEnexis NetbeheerStedinEliaElviaBayernwerk NetzDTEKIsrael ElectricDEWABGE
One of our strategic pillars is excellent grid management by utilizing existing assets. Implementing Smart Cable Guard was the foundation to enable meshed operations and other innovative operational concepts.
Denny HarmsenConsultant Innovation System Operations, AllianderRead the case study
Next step

See your grid the way we see it.

A 30-minute walkthrough of the platform on data from a network like yours.